053第521题,053521
521.You notice that a job in a chain has not completed on a nonconstrained RAC database. Which ofthese are valid reasons why that might occur?
A. The job priority is 1 and the resource consumer group CPU emphasis allocation is a low percentage.
B. The job affinity is to a service and one node in that service is unavailable.
C. The job affinity is to an instance and that instance is unavailable.
D. There is no service affinity.
E. None of the above.
Answer:
C
The Scheduler enables you to specify the database service under which a job should be run (service affinity). This ensures better availability than instance affinity because it guarantees that other nodes can be dynamically assigned to the service if an instance goes down. Instance affinity does not have this capability, so, when an instance goes down, none of the jobs with an affinity to that instance can run until the instance comes back up. Figure 28-8 illustrates a typical example of how services and instances could be used.
Figure 28-8 Service Affinity and the Scheduler
版权声明:本文为博主原创文章,未经博主允许不得转载。
本站文章为和通数据库网友分享或者投稿,欢迎任何形式的转载,但请务必注明出处.
同时文章内容如有侵犯了您的权益,请联系QQ:970679559,我们会在尽快处理。