CBO估计执行计划需要参考的三项,cbo执行计划
Estimator
The estimator determines the overall cost of a given execution plan. The estimator generates three different types of measures to achieve this goal:
-
Selectivity
This measure represents a fraction of rows from a row set. The selectivity is tied to a query predicate, such as
last_name='Smith', or a combination of predicates. -
Cardinality
This measure represents the number of rows in a row set.
-
Cost
This measure represents units of work or resource used. The query optimizer uses disk I/O, CPU usage, and memory usage as units of work.
If statistics are available, then the estimator uses them to compute the measures. The statistics improve the degree of accuracy of the measures.
最重要的就是上面三个方面:
1.选择度
2.基数
3.成本
本站文章为和通数据库网友分享或者投稿,欢迎任何形式的转载,但请务必注明出处.
同时文章内容如有侵犯了您的权益,请联系QQ:970679559,我们会在尽快处理。